Inspections Required
Inspections are required to ensure that all work is done in conformance with codes and in an appropriate manner. The resident or contractor is required to call the Community Development Department a minimum of twenty-four (24) working hours in advance for all inspections.
Required Building Inspections for Residential Improvements
|
|
Site
|
JULIE |
Post hole |
Pre- |
Foot- |
Under- |
Rough |
Rough |
Rough
|
Rough Struc |
Final |
|---|---|---|---|---|---|---|---|---|---|---|---|
|
Deck |
X |
X |
X |
X |
|||||||
|
Driveway |
X |
X |
X |
||||||||
|
Fence |
X |
X |
X |
||||||||
|
Garage |
X |
X |
X |
X |
D |
D |
D |
D |
D |
X |
|
|
Patio |
X |
X |
X |
||||||||
|
Above Ground Pool |
X |
X |
X |
X |
|||||||
|
In Ground Pool |
X |
X |
X |
X |
D |
D |
D |
X |
|||
|
Room Addition |
X |
X |
X |
X |
D |
D |
X |
X |
X |
X |
|
|
Shed |
X |
X |
D |
X |
|||||||
|
Sidewalk |
X |
X |
X |
||||||||
X = An inspection is required
D = An inspection is required depending on design and type of
work included




